Maintenance, Testing and Inspection Log Hot Water Heating Boilers
| I |
Fill in the name of the building, its location, boiler number, fuel type used, and the year. Name the person to be contacted in an emergency or malfunction. |
| II |
Daily Checks |
|
(1) |
Record pressure |
|
(2) |
Record temperature. |
|
(3) |
Record the flue gas temperature. (This should be done withe boiler running and at temperature.) |
| III |
Weekly Checks (Record the date and time test was completed) |
|
(1) |
Observe Flame Condition |
|
(2) |
Observe circulating pumps for proper operation. |
| IV |
Monthly Checks (Record the date and time test was completed) Review the condition of, check or test each item. |
|
(A) |
Test Flame Detection Devices |
|
(B) |
Test Limit Controls. |
|
(C) |
Test Operating Controls. |
|
(D) |
Test Floor Drains to be sure tehy are draining properly. |
|
(E) |
Check fuel piping for leakage. |
|
(F) |
If possible, without opening the boiler, check the refractory for cracking and deterioration. |
|
(G) |
Check Stop Valves. |
|
(H) |
Inspect Check Valves |
|
(I) |
Check Drain Valves. |
|
(J) |
Check Linkages for damage or disconnection. |
|
(K) |
Observe Water Level of gauge glass on expansion tank (if applicable). |
|
(L) |
Check combustion air supply for obstruction and adequacy of air flow. |
|
(M) |
On Relief Valve Lift try-lever to full open and release it to snap shut. |
|
(N) |
Test Low Water Cutoff (if possible). |
| V |
Yearly Checks (Record the date and time test was completed) Review the condition of, check or test each item. |
|
(1) |
Inspect and clean the fireside of the boiler. Examine all gaskets and replace as necessary. |
|
(2) |
Inspect and clean the waterside of the boiler every two years (and more often if necessary). Replace ALL hand hole gaskets. |
|
(3) |
Perform slow drain test to test low water cutoffs (with burner running). |
|
(4) |
Dismantle, Inspect and Clean Low water cutoffs, water columns and equalizing piping. |
|
(5) |
Perform daily, weekly and monthly tests noted above. |
| VI |
Retain this log for at least two years |
SAMPLE BOILER ROOM LOG Hot Water Heating Boiler